Guides
What a custom kitchen costs in New York
What sets the price
Every kitchen we build is drawn and made for its room, so the estimate is written from your drawings rather than a price list. Five things move the number most:
- Size and layout. The number of cabinets, tall units, an island and how much of the room the millwork covers.
- Wood and veneer. Species and cut, such as rift white oak, walnut or dyed ash. We use FSC-certified wood wherever possible.
- Finish. Stain, lacquer, oil or a specialty finish, sprayed in our own booth and matched to an approved sample.
- Hardware and appliances. Integrated appliances need panels, ventilation and precise coordination in the shop drawings.
- The building. Co-op work rules, freight elevator schedules and field conditions all shape installation.
How long it takes
A custom kitchen typically takes 12–16 weeks from first drawings to installation: about 2–4 weeks for design and shop drawing approval, 8–10 weeks of production in our Brooklyn workshop and 2–3 weeks of installation. The schedule is confirmed once shop drawings are approved.
How to get an accurate number
- Send your drawings, images and timeline by the commission form, email or text.
- We review the project with you and your design team on a video call.
- We send a preliminary estimate and adjust the scope with you until it fits.
- Once the estimate is approved and the written agreement is signed, we survey the site and begin shop drawings.
See every step on our process page, or browse our custom kitchens.
How a kitchen compares with other projects
| Project | Typical value | Typical duration |
|---|---|---|
| Media wall or built-in | from about $30,000 | 12–16 weeks |
| Kitchen | from about $70,000 | 12–16 weeks |
| Several rooms | about $100,000 | 4–6 months |
| Full residence | from $300,000 | 6–8 months |
| Full residence, larger | $1 million and above | 14–18 months or more |
Questions
How much does a custom kitchen cost?
Kitchen commissions typically start around $70,000. The final figure depends on:
- The size and layout of the kitchen
- The wood or veneer and the finish
- Hardware and interior fittings
- How many appliances are integrated into the cabinetry
- Lighting, islands, tall storage and other built-in details
We price from your design drawings, finish schedule and scope. For homeowners without drawings, we price from a description, the main dimensions and photos of the room. The preliminary estimate is revised as needed until it covers every part of the scope, so everything is accounted for before the agreement is signed.
How long does a custom kitchen take?
Typically 12–16 weeks from first drawings to installation: about 2–4 weeks for design and shop drawing approval, 8–10 weeks of production and 2–3 weeks of installation. The schedule is confirmed once shop drawings are approved.
Can we make changes once the project starts?
Yes. Changes are a normal part of a residence taking shape.
Every change is documented in a written change order with its cost and any effect on the schedule. The change order is approved before the work goes ahead, so you, your design team and your contractor always know where the project stands.
The best time to make changes is during the shop drawing stage. Once production starts, changes to parts already built can affect both cost and schedule.
Planning a kitchen?
Share your drawings and timeline, and we'll reply within two business days.